.new construction
.lynnwood, washington
.2008-2009
This project was a unique Fred Meyer project, deviating from the prototype design I worked with the design team and the Owner to develop an exterior appearance that tied in with the rest of the new retail development.
I was part of the team for this project from early investigation through design, permitting and construction. I was involved in the work on nearly every aspect of this building, from coordinating internal team members, consultants and the construction documents, to running truck route analysis and detailing the stone veneer.
LSA, Inc. Engineering Alderwood Fred Meyer project page
Images of the Alderwood Fred Meyer on Yelp
Short blog post with information and an image of the store
A blog containing my resume and portfolio for prospective employers, peers and the plain old curious.
Thursday, May 30, 2013
.naukati school
.new construction
.naukati, alaska
.2003-2005
The Southeast Island School District had many remote schools in decline. Naukati School, located on Prince of Wales Island, is a K-12 school with a population of 24-45 students. It replaced the series of temporary trailers and floating gym that had previously been used to hold classes and community events.
The building was designed to allow simple future expansion options and is clustered around a bright commons.
I worked together with other architects and landscape architects in the office, under supervision of the principal architect, from conceptual design to construction documents. I then was the primary person responsible for the construction administration and project closeout.
Jensen Yorba Lott, Inc. Naukati School Project Information
Naukati School Website
.naukati, alaska
.2003-2005
The Southeast Island School District had many remote schools in decline. Naukati School, located on Prince of Wales Island, is a K-12 school with a population of 24-45 students. It replaced the series of temporary trailers and floating gym that had previously been used to hold classes and community events.
The building was designed to allow simple future expansion options and is clustered around a bright commons.
I worked together with other architects and landscape architects in the office, under supervision of the principal architect, from conceptual design to construction documents. I then was the primary person responsible for the construction administration and project closeout.
Jensen Yorba Lott, Inc. Naukati School Project Information
Naukati School Website
Sunday, May 19, 2013
.wells fargo glacier valley
.renovation
.juneau, alaska
.2001 - 2005
After acquisition of a local chain of banks, Wells
Fargo looked to update the look of the branch.
The renovation involved expansion of the entry, relocation of offices
and teller line, and replacing finishes.
The construction work was completed under a single contract, with
internal phasing so that the bank could maintain full services during the
entire construction process.
I became involved in the design of the renovation
near the latter part of several stops and starts in the design process. I took over redesign based on the clients
feedback and then continued the project through completion of construction
administration. I was project manager
and worked closely with the client and consultants, as well as our interior
design staff.
.juneau, alaska
.2001 - 2005
entry after renovation |
entry before renovation |
.gustavus k-12 school
.renovation
.gustavus, alaska
.2005 - 2007
I worked with principal
architect to conduct the condition survey and meetings with the community and
school for Phase 1. Then I worked to
develop the schematic design, then assisted staff and the principal through
Design Development and Construction Documents.
I was the primary person responsible for Construction Administration and
all parts of Phase 2, from the condition survey and meetings, through all
Phases of design. I finished up bidding
and negotiations before leaving Juneau .
.gustavus, alaska
.2005 - 2007
The Chatham
School District asked us to design the
renovation of the interior and exterior of Gustavus School . The School has about 20 to 30 students, K-12. After conducting a condition survey, meetings
with the school and community, it was determined that the school needed an
exterior face lift and an improved science classroom and administration area, as
well as electrical and mechanical upgrades.
after exterior renovation |
before exterior renovation |
after exterior renovation |
Friday, May 17, 2013
.floyd dryden middle school
.renovation
.juneau, alaska
.2002 - 2006
Phase 1 renovated most of the interiors; Phase 2
renovated the exterior and the remaining interior spaces. The main goal of the exterior remodel was to reinvigorate
the look of the building, while maintaining the integrity of the original
1960’s design. The interior of the
building had many found spaces, used by students and staff in order to deal
with overcrowding. The challenge was to
improve the learning environment within the existing framework.
.juneau, alaska
.2002 - 2006
I was involved from the condition survey to construction
administration and warranty assistance on both phases. I was the primary contact for the clients and
consultants, the lead designer and the project manager. At the beginning I worked closely with the
principal architect, but by the end of the project I worked mostly
independently.
gymsnasium |
hallway with mural and trophy case |
.valdez ferry terminal
Photo: Tony Yorba |
.valdez, alaska
.2001 - 2003
The Valdez Ferry Terminal was inspired by the new high tech ferry system introduced to
I participated in all aspects of design for
this project starting at Conceptual Design.
Just out of school, I relied a lot on the principal architect to
coordinate other disciplines and technical details, but much of the
design work, document development and construction administration were my
responsibilities.
Photo: Tony Yorba |
Photo: Tony Yorba |
Tuesday, May 14, 2013
.awards
.distinguished service award
"Ringleader and Organizer Extraordinaire"
2006 AIA Alaska State Convention
.merit award
hand sketch perspective of sidewalk view of shophouse |
2005 Design Competition, AIA Alaska Chapter
.excellence award
Shophouse, Kuo-Hsing, Taiwan1999-2000 HSS Design and Engineering Challenge
Association of Collegiate Schools of Architecture and
The Steel Tube Institute of North America
cad axonometric of shophouse |
hand sketch of shophouse street elevation |
.skills
.all phases of design
.project management
.programming
.condition and compliance surveying
.schematic cost estimation
.code review
.document review and coordination
.specification research and writing
.construction administration and project closeout
.revit, autocad, photoshop, pagemaker, powerpoint, excel, word, more
.collaboration and individual work
.hand drafting, sketching and diagramming
.organization and communication
.enthusiasm and sense of humor
.project management
.programming
.condition and compliance surveying
.schematic cost estimation
.code review
.document review and coordination
.specification research and writing
.construction administration and project closeout
.revit, autocad, photoshop, pagemaker, powerpoint, excel, word, more
.collaboration and individual work
.hand drafting, sketching and diagramming
.organization and communication
.enthusiasm and sense of humor
Monday, May 13, 2013
.experience
.associate
MulvannyG2 ArchitecturePortland, Oregon
2007-2011
.intern architect
Jensen Yorba Lott, Inc.Juneau, Alaska
2001-2007
.education
.bachelor of architecture, cum laude
University of OregonEugene, Oregon
1996-2001
.studied fine arts and interior design
Kendall College of Art and DesignGrand Rapids, Michigan
1993-1995
.achievements
.bachelor of architecture from the University of Oregon
.ten years of diverse, high quality architecture experience
.completed NCARB IDP
Subscribe to: